The condition
The property required a complete post-construction reset before use. Fine building dust, residue on glazing and marked floor areas made a standard cleaning visit unsuitable.
The protocol
The team planned products, equipment and sequence around the actual surfaces and contamination.
- Detailed glass and frame cleaning
- Removal of construction dust and visible residue
- Room-by-room finishing and final review
The outcome
The client accepted the completed work enthusiastically and compared the level of detail to detailing. The direct quotation will be added after written permission.
